TRANSFORM · PQM

Run post-quantum migration as a governed operating programme.

PQM connects discovery, crypto inventory, dependencies, prioritisation, migration planning, approvals and verification into one evidence-led operating system for post-quantum migration.

The problem

Post-quantum migration is not a one-time scanning exercise.

The enterprise job is to discover exposure, understand dependencies, choose and approve treatment, then prove the resulting state.

Discovery is fragmented

Cryptographic exposure can be scattered across code, configurations, services and infrastructure rather than held in one governed inventory.

Priority can become subjective

Teams need a traceable basis for why one vulnerable use matters before another, not an opaque readiness score.

Planning and approval drift apart

Migration decisions need affected scope, standards-grounded treatment and an explicit approval boundary before remediation proceeds.

Verification is often weak

A migration is not complete because a ticket closed; the resulting state needs exact post-change evidence and a governed verification result.

Migration operating flow

Govern the path from discovered evidence to verified remediation.

  1. 01

    Discover

    Identify cryptographic usage and preserve the exact evidence that supports each finding.

  2. 02

    Inventory

    Build an evidence-oriented view of vulnerable usage without inventing unsupported asset metadata.

  3. 03

    Map dependencies

    Understand what a change depends on and what may be affected before prioritisation.

  4. 04

    Prioritise

    Use explicit risk inputs and governed state rather than synthetic readiness scores.

  5. 05

    Plan and approve

    Define the migration treatment, affected scope and expected verification condition before a consequential human approval.

  6. 06

    Verify

    Compare before evidence, approved remediation and after re-scan evidence to produce VERIFIED, PARTIAL or FAILED.

Core operating surfaces

A migration console built around state, evidence and action.

The product deliberately avoids synthetic readiness scores and decorative dashboards. Each surface should answer a specific migration question.

  • 01
    Portfolio / Migration Readiness

    Attention queue first, followed by factual workspace posture rather than decorative metrics.

  • 02
    Workspace Overview

    Current state, required next action and governed workflow progression remain primary.

  • 03
    Crypto Inventory + Finding Detail

    Exact evidence is visually stronger than model interpretation, with deterministic facts kept separate.

  • 04
    Migration Plan + Approval

    Affected scope, standards-grounded plan, human approval and expected verification condition are explicit.

  • 05
    Verification

    Forensic Before → Approved Remediation → After Re-scan → Result structure.

Control philosophy

Exact evidence outranks summary decoration.

PQM keeps deterministic state, model interpretation and consequential human decisions visibly separate so the migration basis remains inspectable.

01

No synthetic readiness score

Portfolio state is expressed through factual counts, governed workflow state, priorities and exceptions.

02

Evidence first

Exact source evidence and provenance remain stronger than model explanation or summary narrative.

03

Approval is not execution

A migration approval is a distinct human decision and does not silently imply that remediation has been carried out.

04

Verification is forensic

Before and after evidence are compared against the expected verification condition rather than a generic completion marker.

Verification structureEvidence-led
BeforeExact original evidence

Preserve the discovered cryptographic state and the finding that required treatment.

Approved remediationWhat was authorised

Keep the approved treatment, affected scope and expected verification condition explicit.

After re-scanVERIFIED / PARTIAL / FAILED

The resulting state is based on exact post-change evidence, not on a ticket being marked complete.

Product boundary

No invented progress, unsupported production claim or decorative maturity signal.

Product state, actions and verification results should correspond to governed domain state. Human approval remains explicit where the consequence warrants it.

PQM · Post-Quantum Migration OS

Examine the governed migration workflow.